“Museum project poses logistical challenges” – Upgrading the Museum of London required a co-ordinated approach due to a tight working environment and demanding client needs. Read our case study on this project that was published in H&V News.

Nov2012

Award of replacement pipework contract, serving a municipal swimming pool.

Nov2012

Award of a pipework contract for the extraction of minerals.

Sep2012

Supply and installation of PVDF pipework for a high purity chemical application.

Jul2012

Installation of large diameter ABS pipework for a charging system for a marine application.

Apr2012

Design and manufacture of a cutting edge high pressure gas control system for a leading edge defence contractor.

Feb2012

Awarded the contract to overhaul and refurbish and certify cutting edge cooling assets for a leading European defence customer.

Dec2011

Contract to install expansion of task air provision in a UK automotive plant.

Nov2011

Latest phase of a chilled water installation serving data centre equipment installed and handed over.

Aug2011

Ongoing work on a green grant funded rainwater harvesting system and hot and chilled water turn-key project at a landmark national municipal building.

Apr2011

Design and prototype build for a global automotive manufacturer of equipment designed to improve manufacturing and assembly methods.